Skip to main content
All projects
Information systemPetra Christian University

SIM Realisasi

Sistem Informasi Manajemen (SIM) Realisasi collects, verifies, stores and reports every activity carried out under Petra Christian University (PETRA) MoUs and MoAs, counted toward RENSTRA (Rencana Strategis), the university's strategic plan.

From agreements on paper to real activities.

Live demo

Try SIM Realisasi

The working app, on demo data: the dashboard, the activity list and the single-page report form.

Live demo

SIM Realisasi

The working app, running on demo data. It loads here, inside the page.

Demo environment with generated activities over real agreements. Figures there are not official PETRA indicators.
Point of view
133Activities in the demo
297RENSTRA 1.1 students, 2025/26
5Indicators reported
RENSTRA 1.1 by semester, 2025/26
RENSTRA 1.1 students in 2025/26 by semester, demo data
  • Odd semester (Ganjil)16556%
  • Even semester (Genap)13244%

Demo data generated over the real SIM Kerjasama agreements and units; not yet real activities.

Background

Why realisation needed its own system

An agreement is only worth what is carried out under it. Until now, nobody could count that reliably.

The problem
  • Realisations reached the International Office through scattered reports, emails and spreadsheets.
  • Counting inbound and outbound students meant manual reconciliation every semester.
  • The same student could be reported by two units and counted twice.
  • Last semester's numbers shifted whenever a late report arrived.
With the system
  • Each academic unit reports its own activities on one page, with the IA, IR and participants attached.
  • Student and employee numbers are checked against BAAK and HR, and duplicates are decided once.
  • Indicators are computed by the database from verified data only.
  • Each semester is frozen into a snapshot on its cutoff date, so reported numbers never change.
Objectives · Tujuan

Five objectives

  1. Every activity on record

    Collect each activity carried out under a PETRA MoU or MoA, linked to that exact agreement.

  2. Verified before counted

    Mobility activities are checked by the IO Mobility team; only verified data reaches the numbers.

  3. Indicators without recaps

    RENSTRA 1.1, 1.19.S1 and 1.19.S4 and the International Awards come straight from the data.

  4. Reports that stay put

    Frozen semester snapshots make every report reproducible.

  5. Show which agreements are used

    Feed activity back to SIM Kerjasama so dormant partnerships surface.

Outcomes

Three things it delivers

1

RENSTRA indicators

Calculated from verified data, with drill-down to every activity.

2

Semester reports

Built from frozen, reproducible snapshots.

3

Dormant partnerships

Made visible, with that information fed back to SIM Kerjasama.

Included: Activities that implement a PETRA MoU or MoA recorded in SIM Kerjasama.

Not included: IISMA, free movers, government scholarships, and imports of historical data.

Key concepts

Six terms the system is built on

Kegiatan
One activity under one agreement, documented by one Implementation Arrangement (IA) and one Implementation Report (IR).
Kerja sama
The single MoU or MoA from SIM Kerjasama the activity implements, picked from documents valid on the activity dates.
Renewal chain
An agreement plus all its renewals. Realisation of agreements (1.19.S4) counts chains, so a mid-year renewal counts once.
Jenis Kegiatan
The activity type list. IO decides per type whether it is mobility and whether it counts for 1.19.S1.
Mobility activity
Needs a participant list and one combined PDF, and is verified by the IO Mobility team. Others are verified on submit.
Snapshot
A semester's frozen indicator values, with the IDs of every record behind them and the settings used.
Business process

From activity to indicator

Modelled in BPMN: one process follows an activity through verification; the other covers what runs on a schedule.

One activity, from the unit that ran it to the indicators it counts toward.

Academic unit
IO Mobility team
SIM Realisasi
Activity completed
Fill in details, pick the agreement
Save draft; set semester and deadlineDraf
×Mobility activity?No: upload IA & IRYes: add participants
Look up student and staff numbers (BAAK & HR)
Submit the activityDiajukan
Validate, flag late, detect duplicatesMenunggu verifikasi
Review participants and the mobility PDF
×In order?No: request revisionYes: approve
Mark verified, notify the unitTerverifikasi
Counted toward RENSTRA and AwardsTerhitung
  1. Academic unit: Activity completed
  2. Academic unit: Fill in details, pick the agreement
  3. SIM Realisasi: Save draft; set semester and deadline, status Draf
  4. Academic unit: Mobility activity? (No: upload IA & IR, Yes: add participants)
  5. SIM Realisasi: Look up student and staff numbers (BAAK & HR)
  6. Academic unit: Submit the activity, status Diajukan
  7. SIM Realisasi: Validate, flag late, detect duplicates, status Menunggu verifikasi
  8. IO Mobility team: Review participants and the mobility PDF
  9. IO Mobility team: In order? (No: request revision, Yes: approve)
  10. SIM Realisasi: Mark verified, notify the unit, status Terverifikasi
  11. SIM Realisasi: Counted toward RENSTRA and Awards, status Terhitung
Scroll sideways to follow the flow. Dark boxes with a cog are steps the system runs on its own; blue mono labels are the status a step sets.
  1. Draf
  2. Diajukan
  3. Menunggu verifikasi
  4. Terverifikasi
  5. Terhitung
FlagsPerlu revisiTerlambat
R1

Reporting deadline

Semester and academic year come from the start date; the deadline is the end date plus 30 days. Late submissions are flagged, not refused.

R2

Nothing is rejected

A wrong submission always comes back as a revision with a note, and returns as participant version n+1.

R3

Duplicate students

If two units report the same student, the Mobility team picks the activity that keeps them. Approval waits until it is decided.

R4

Drafts only

Drafts can be deleted by their creator or IO Admin. A submitted activity is never deleted.

Report an activity

Four steps, one page

Step 1/4

Details. Pick the agreement valid on the activity date.

The app

Seven menus

Dashboard
RENSTRA indicators and activity overview
Activities
Every reported activity and its status
New Activity
Report an activity on a single page
Mobility Verification
Participant checks with duplicate handling
Reports & Export
Semester snapshots and downloads
Settings
Periods and reference data
Documents
Browse SIM Kerjasama agreements with their activity summary
Data flow

Three sources in, four results out

  • SIM KerjasamaAgreements valid on the activity date, with renewal chains
  • Academic unitsActivity details, IA, IR and participants
  • BAAK & HRStudent and employee numbers
SIM RealisasiVerifies, de-duplicates, counts verified data only, and freezes each semester.
  • RENSTRA 1.1Inbound and outbound students
  • RENSTRA 1.19.S1 · 1.19.S4International activities; agreements realised
  • International AwardsStudy programs ranked on verified activity
  • Back to SIM KerjasamaImplementation tab and "no activity yet" flag
Access

Who can do what

Enforced in the database with row-level security, not only hidden in the interface. Every export with student data is logged (UU PDP 27/2022).

ActionAcademic unitIO MobilityIO AdminLeadership
Create, submit and revise activitiesOwn unitNoOn behalf of a unitNo
See activitiesOwn and co-unitAllAllVerified only
See participant names and mobility PDFsOwnYesYesNo
Verify mobility, decide duplicate studentsNoYesYesNo
Edit a verified activity (logged)NoParticipantsYesNo
Settings, calendar, activity-type rules, freezeNoNoYesNo
Dashboard, awards, non-personal ExcelOwn unitYesYesYes
Excel with student data (logged)Own unitYesYesNo
Integration

Each shows the other's data

Tap a card.

In SIM Kerjasama
In SIM Realisasi
Benefits · Manfaat

Who gains what

Tap a card. See also university support on partnership.