SIM Realisasi
Sistem Informasi Manajemen (SIM) Realisasi collects, verifies, stores and reports every activity carried out under Petra Christian University (PETRA) MoUs and MoAs, counted toward RENSTRA (Rencana Strategis), the university's strategic plan.
From agreements on paper to real activities.
Try SIM Realisasi
The working app, on demo data: the dashboard, the activity list and the single-page report form.
SIM Realisasi
The working app, running on demo data. It loads here, inside the page.
- Odd semester (Ganjil)16556%
- Even semester (Genap)13244%
Demo data generated over the real SIM Kerjasama agreements and units; not yet real activities.
Why realisation needed its own system
An agreement is only worth what is carried out under it. Until now, nobody could count that reliably.
- Realisations reached the International Office through scattered reports, emails and spreadsheets.
- Counting inbound and outbound students meant manual reconciliation every semester.
- The same student could be reported by two units and counted twice.
- Last semester's numbers shifted whenever a late report arrived.
- Each academic unit reports its own activities on one page, with the IA, IR and participants attached.
- Student and employee numbers are checked against BAAK and HR, and duplicates are decided once.
- Indicators are computed by the database from verified data only.
- Each semester is frozen into a snapshot on its cutoff date, so reported numbers never change.
Five objectives
Every activity on record
Collect each activity carried out under a PETRA MoU or MoA, linked to that exact agreement.
Verified before counted
Mobility activities are checked by the IO Mobility team; only verified data reaches the numbers.
Indicators without recaps
RENSTRA 1.1, 1.19.S1 and 1.19.S4 and the International Awards come straight from the data.
Reports that stay put
Frozen semester snapshots make every report reproducible.
Show which agreements are used
Feed activity back to SIM Kerjasama so dormant partnerships surface.
Three things it delivers

RENSTRA indicators
Calculated from verified data, with drill-down to every activity.

Semester reports
Built from frozen, reproducible snapshots.

Dormant partnerships
Made visible, with that information fed back to SIM Kerjasama.
Included: Activities that implement a PETRA MoU or MoA recorded in SIM Kerjasama.
Not included: IISMA, free movers, government scholarships, and imports of historical data.
Six terms the system is built on
- Kegiatan
- One activity under one agreement, documented by one Implementation Arrangement (IA) and one Implementation Report (IR).
- Kerja sama
- The single MoU or MoA from SIM Kerjasama the activity implements, picked from documents valid on the activity dates.
- Renewal chain
- An agreement plus all its renewals. Realisation of agreements (1.19.S4) counts chains, so a mid-year renewal counts once.
- Jenis Kegiatan
- The activity type list. IO decides per type whether it is mobility and whether it counts for 1.19.S1.
- Mobility activity
- Needs a participant list and one combined PDF, and is verified by the IO Mobility team. Others are verified on submit.
- Snapshot
- A semester's frozen indicator values, with the IDs of every record behind them and the settings used.
From activity to indicator
Modelled in BPMN: one process follows an activity through verification; the other covers what runs on a schedule.
One activity, from the unit that ran it to the indicators it counts toward.
- Academic unit: Activity completed
- Academic unit: Fill in details, pick the agreement
- SIM Realisasi: Save draft; set semester and deadline, status Draf
- Academic unit: Mobility activity? (No: upload IA & IR, Yes: add participants)
- SIM Realisasi: Look up student and staff numbers (BAAK & HR)
- Academic unit: Submit the activity, status Diajukan
- SIM Realisasi: Validate, flag late, detect duplicates, status Menunggu verifikasi
- IO Mobility team: Review participants and the mobility PDF
- IO Mobility team: In order? (No: request revision, Yes: approve)
- SIM Realisasi: Mark verified, notify the unit, status Terverifikasi
- SIM Realisasi: Counted toward RENSTRA and Awards, status Terhitung
- Draf
- Diajukan
- Menunggu verifikasi
- Terverifikasi
- Terhitung
Reporting deadline
Semester and academic year come from the start date; the deadline is the end date plus 30 days. Late submissions are flagged, not refused.
Nothing is rejected
A wrong submission always comes back as a revision with a note, and returns as participant version n+1.
Duplicate students
If two units report the same student, the Mobility team picks the activity that keeps them. Approval waits until it is decided.
Drafts only
Drafts can be deleted by their creator or IO Admin. A submitted activity is never deleted.
What the system does on its own schedule, and what leadership receives.
- SIM Realisasi: Every day
- SIM Realisasi: Check drafts near deadline and open revisions
- SIM Realisasi: Anything due? (Yes: remind, No: nothing)
- Academic unit: Complete or resubmit the activity
- SIM Realisasi: Semester cutoff date
- SIM Realisasi: Compute indicators from verified data
- SIM Realisasi: Freeze the snapshot with record IDs
- IO Admin: Re-freeze with a reason (only if needed)
- Leadership: Read the dashboard and download reports
- Leadership: Semester reported
Daily reminders
Drafts close to their deadline, and revisions open seven days or more, get an in-app and email reminder.
Semester freeze
On the cutoff date the daily job freezes the semester's indicators into a snapshot with every record ID behind them. IO Admin can only re-freeze, with a reason.
Late changes
An activity verified or edited inside a frozen window is logged as a post-freeze change, not merged silently.
Reports
Leadership reads snapshots and live year-to-date figures side by side, and downloads them as Excel.
Four steps, one page
Details. Pick the agreement valid on the activity date.
Seven menus
- Dashboard
- RENSTRA indicators and activity overview
- Activities
- Every reported activity and its status
- New Activity
- Report an activity on a single page
- Mobility Verification
- Participant checks with duplicate handling
- Reports & Export
- Semester snapshots and downloads
- Settings
- Periods and reference data
- Documents
- Browse SIM Kerjasama agreements with their activity summary
Three sources in, four results out
- SIM KerjasamaAgreements valid on the activity date, with renewal chains
- Academic unitsActivity details, IA, IR and participants
- BAAK & HRStudent and employee numbers
- RENSTRA 1.1Inbound and outbound students
- RENSTRA 1.19.S1 · 1.19.S4International activities; agreements realised
- International AwardsStudy programs ranked on verified activity
- Back to SIM KerjasamaImplementation tab and "no activity yet" flag
Who can do what
Enforced in the database with row-level security, not only hidden in the interface. Every export with student data is logged (UU PDP 27/2022).
| Action | Academic unit | IO Mobility | IO Admin | Leadership |
|---|---|---|---|---|
| Create, submit and revise activities | Own unit | No | On behalf of a unit | No |
| See activities | Own and co-unit | All | All | Verified only |
| See participant names and mobility PDFs | Own | Yes | Yes | No |
| Verify mobility, decide duplicate students | No | Yes | Yes | No |
| Edit a verified activity (logged) | No | Participants | Yes | No |
| Settings, calendar, activity-type rules, freeze | No | No | Yes | No |
| Dashboard, awards, non-personal Excel | Own unit | Yes | Yes | Yes |
| Excel with student data (logged) | Own unit | Yes | Yes | No |
Each shows the other's data
Tap a card.
How SIM Realisasi is built
Transcribed from the source repository: migrations, functions, README and rules. The database owns the business rules; the app calls into it.
One database, two systems
Realisasi lives in schema realisasi beside SIM Kerjasama and only reads it through views in schema kerjasama. It never writes SIMKS tables.
Business rules in the database
Status derivation, period derivation, chain resolution and KPI math are SQL, so the UI, exports and snapshots can never disagree.
External systems behind an RPC
BAAK and HR are mocked, but the app only calls lookup_students and lookup_employees, so production swaps the implementation, not the app.
Frozen means frozen
Snapshots are written once; a correction creates a new superseding snapshot with a reason.
Privacy by default
Participant data and transcripts sit behind RLS and private storage; every personal-data export is logged.
Stack and moving parts
- Dashboard and period selector
- Kegiatan list, detail, new, revision
- Verifikasi Mobilitas and duplicates
- Laporan and Excel route handlers
- Pengaturan (IO Admin)
- schema realisasi: tables, triggers, RPCs
- schema kerjasama: read-only views over SIM-KS
- mock_baak / mock_hr registries
- pg_cron: realisasi-daily-jobs
- RENSTRA 1.1, 1.19.S1, 1.19.24
- International Awards
- Frozen semester snapshots
- Realisasi tab back in SIM Kerjasama
| Layer | Choice |
|---|---|
| Frontend | Next.js 15 App Router, TypeScript, Tailwind, shadcn/ui |
| Forms | react-hook-form + zod, schemas shared client and server |
| Data | Supabase Postgres, RLS, SQL functions, @supabase/ssr |
| Auth | Supabase Auth, shared with SIM Kerjasama; demo role switcher |
| Files | Supabase Storage, private buckets, 5-minute signed URLs |
| Jobs | pg_cron for reminders and freezes; triggers for the duplicate scan |
| Excel & charts | exceljs in route handlers (streamed), Recharts |
| Tests | SQL acceptance tests, Vitest, Playwright |
What each step does to the database
Pick a step: the functions it calls, the tables it writes, the status it sets and the rules that guard it. The touched tables light up in the ERD.
Fill in details, pick the agreement
The activity, its units and one agreement link (the original document plus its chain_id). Partner name and country are snapshotted by trigger.
documents_valid_between()save_activity_draft()activitiesactivity_unitsactivity_documentsactivity_partner_snapshotdocumentsRules: R-03, R-04, R-05, R-06
Highlighted in amber: activities, activity_units, activity_documents, activity_partner_snapshot, documents.
Check drafts near deadline and open revisions
Refreshes stored chain ids (SIM Kerjasama may re-parent documents), then scans drafts and open revisions.
run_daily_jobs()_mark_once()activity_documentsjob_marksHighlighted in amber: activity_documents.
Entities and attributes
The core of the SIM Realisasi schema, grouped by domain. Select a table to trace its relationships.
- SIM Kerjasama views
- Kegiatan
- Participants & verification
- Calendar, config & RENSTRA
- Operations & mock registries
- foreign key
- logical reference
Select a table to highlight its relationships. Scroll the diagram in both directions.
Every table shown, column by column
SIM Kerjasama views (5)
kerjasama.units
id (PK), name, parent_id, is_academic, +2
kerjasama.agendas
id (PK), name, is_active
kerjasama.documents
id (PK), doc_number, kind, status, start_date, end_date, auto_renewed, predecessor_id (FK*), +5
kerjasama.partners
id (PK), name, country_code (FK*), merged_into_id, +1
kerjasama.countries
code (PK), name, is_domestic, +2
Kegiatan (5)
activity_units
activity_id (PK), unit_id (PK), is_submitter
activity_documents
activity_id (PK), original_document_id (PK), chain_id, out_of_scope_warning
activity_partner_snapshot
id (PK), activity_id (FK), partner_id (FK*), partner_name, country_code, +2
activity_files
id (PK), activity_id (FK), kind, version, storage_path, is_current, +6
activities
id (PK), code (UQ), agenda_id (FK*), direction, start_date, end_date, academic_year_id (FK), semester_id (FK), status, mobility_status, reporting_deadline, is_late, verified_at, +13
Participants & verification (4)
participant_set_versions
id (PK), activity_id (FK), version, status, review_note, +4
participant_students
id (PK), set_version_id (FK), section, nrp (FK*), prodi_name, home_institution, +4
participant_staff
id (PK), set_version_id (FK), employee_id (FK*), full_name, +1
participant_conflicts
id (PK), nrp, activity_a (FK), activity_b (FK), status, kept_activity_id (FK), +4
Calendar, config & RENSTRA (5)
agenda_rules
agenda_id (PK), mobility_category, counts_for_s1, +2
academic_years
id (PK), label (UQ), start_date, end_date
semesters
id (PK), academic_year_id (FK), term, cutoff_date, +2
kpi_snapshots
id (PK), academic_year_id (FK), kind, values, settings_used, superseded_by (FK), refreeze_reason, +6
kpi_snapshot_items
snapshot_id (FK), kpi_code, ref_id, is_late_addition, +2
Operations & mock registries (6)
activity_log
id (PK), activity_id (FK), kind, action, diff, in_frozen_period, +4
mock_baak.students
nrp (PK), full_name, prodi_name, category, status, +5
mock_hr.employees
employee_id (PK), full_name, unit_name, status, +1
notifications
id (PK), recipient_id, kind, read_at, +4
email_outbox
id (PK), to_email, subject, sent_at, +2
export_log
id (PK), actor_id, export_kind, row_count, contains_personal_data, +2
FK* = logical reference to a view or registry, checked by a function because views cannot be foreign-key targets.
Where each rule is enforced
| ID | Rule | Enforced by |
|---|---|---|
| R-03 | An activity links to exactly one agreement. The link stores the original document; the current one is always resolved through the renewal chain. | activity_documents + chain_current |
| R-04 | An agreement is selectable if its validity overlaps the activity dates, whatever its status today. Rejected and in-process documents never are. | documents_valid_between |
| R-06 | Partner name and country are snapshotted at link time; later edits or merges in SIM Kerjasama do not change them. | Trigger |
| R-09 | Semester and academic year are derived from Tanggal Mulai; a date outside any configured year cannot be submitted. | Trigger |
| R-10 | Reporting deadline = Tanggal Selesai + reporting_deadline_days (default 30). Late submissions are accepted and flagged. | Trigger |
| R-11 | A mobility kegiatan needs participants and one mobility PDF; its track starts pending. Any other kegiatan is verified on submit. | submit_activity |
| R-16 | Every counted student must have an NRP that resolves in BAAK. Unknown NRPs block submission. | lookup_students |
| R-21 | Participant sets are versioned. Only the single approved version counts; approving a new one supersedes the previous. | Trigger |
| R-25 | Overall status is derived, never set directly: draft, revision_requested, verified or in_verification. | _trg_activity_status |
| R-26 | Nothing is rejected: a wrong submission goes back to the unit as a revision. | RPC |
| R-27a | Mobility cannot approve while the kegiatan has open duplicate-student conflicts. | mobility_approve |
| R-33 | Same NRP in two non-draft mobility kegiatan of different submitting units with overlapping dates is a conflict. | _scan_conflicts |
| R-36 | Only verified activities count. Activity date = Tanggal Mulai. | compute_kpis |
| R-42 | Realisation of agreements counts renewal chains, so a mid-year renewal counts once. | compute_kpis |
| R-43 | The denominator excludes chains starting within grace_period_months (default 6) of the cutoff; auto-renewed chains are always included. | compute_kpis |
| R-55 | On each semester cutoff the system freezes a snapshot: Ganjil → ganjil_ytd, Genap → genap_full_year. | run_daily_jobs |
| R-56 | A snapshot stores values, contributing IDs and the settings used. Settings changes never alter existing snapshots. | kpi_snapshots |
| R-63 | Every export containing personal data is logged with actor, filters and row count. | log_export |
| R-64 | No hard deletes after submission; everything is status plus log. | RLS + RPC |
The values the database allows
activity_status- draft
- in_verification
- revision_requested
- verified
track_status- not_required
- pending
- revision_requested
- approved
pset_status- draft
- pending
- revision_requested
- approved
- superseded
mobility_category- jd_dd
- student_exchange
- short_summer
- other_mobility
file_kind- ia
- ir
- mobility_bundle
- evidence
snapshot_kind- ganjil_ytd
- genap_full_year
conflict_status- open
- resolved
direction- inbound
- outbound
What runs on its own
realisasi-daily-jobs → run_daily_jobs()pg_cron 18:00 UTC (01:00 WIB)Refresh chain ids, revision and deadline reminders, semester freezesDuplicate scanTrigger, on submit and every participant changeOpen or close participant_conflicts
Access is the database's job
- Read-only adapterSIM Kerjasama data is reached only through views in schema kerjasama. Views cannot be FK targets, so the RPCs check those references.
- RLS and per-function checksRow-level security plus permission checks inside every SQL function (_require_admin, _require_mobility, _require_team).
- Roles of its ownaccount_roles keeps a Realisasi role per SIM-KS account, so SIM-KS roles stay untouched.
- Personal dataParticipant names and mobility PDFs are visible to the unit and IO only; exports with student data are logged (UU PDP 27/2022).
- Private filesPrivate buckets with 5-minute signed URLs.
Reading SIM Kerjasama without writing it
- Adapter views in schema kerjasamaprofiles, units, agendas, documents, document_partners, document_scope_units, partners and countries, mapped from the SIM-KS tables (0001_kerjasama_adapter.sql).
- Chains, not documentsAn activity stores the original agreement and its chain_id; the current document is always resolved through the renewal chain (chain_current, chain_root).
- Feedback to SIM Kerjasamaagreement_realization and agreement_flags feed the Implementation tab and the "no activity yet" flag.
What the test suite covers
- SQL acceptance tests AT-01..AT-11
- Status machine
- RLS boundaries
- RENSTRA and KPI math
- Duplicate conflicts
- International Awards
- Snapshots and freezes
- Kerjasama adapter
- Vitest unit tests
- Playwright journeys